1. 
        
        <noscript id="2i3ws"><dl id="2i3ws"></dl></noscript>
          <rp id="2i3ws"><dl id="2i3ws"></dl></rp>
          <i id="2i3ws"></i>
        1. <td id="2i3ws"></td>
          <td id="2i3ws"><ins id="2i3ws"><label id="2i3ws"></label></ins></td>

              av一区二区三区在线观看_久久99精品国产自在现线_日日碰狠狠躁久久躁_东京热一区_来一水AV@lysav

              Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

              News



              Tel:(0755)27151698
              Fax:(0755)27150611
              Mailbox:szzyzcl@163.com / szzy@szzy99.com
              Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
              Industry information

              當前位置:

              首頁 News Industry information

              Solution to lack of glue in plastic shell

              Release time:2023-11-29

              Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

              圖片2.png


              The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


              ① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


              ② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


              ③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


              ④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

              Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
              av一区二区三区在线观看_久久99精品国产自在现线_日日碰狠狠躁久久躁_东京热一区_来一水AV@lysav

                1. 
                  
                  <noscript id="2i3ws"><dl id="2i3ws"></dl></noscript>
                    <rp id="2i3ws"><dl id="2i3ws"></dl></rp>
                    <i id="2i3ws"></i>
                  1. <td id="2i3ws"></td>
                    <td id="2i3ws"><ins id="2i3ws"><label id="2i3ws"></label></ins></td>

                        河北省| 沙田区| 化州市| 普安县| 克什克腾旗| 澜沧| 启东市| 松阳县| 河源市| 泾川县| 习水县| 闵行区| 常熟市| 洞头县| 镇远县| 陆川县| 苏尼特左旗| 和静县| 介休市| 侯马市| 婺源县| 都匀市| 张家界市| 永顺县| 华容县| 锡林浩特市| 辉县市| 塔河县| 炉霍县| 长乐市| 方城县| 万荣县| 集贤县| 堆龙德庆县| 建宁县| 寻乌县| 古田县| 辽源市| 利津县| 电白县| 宾川县|